Facebooktwitterlinked ininstagramarchinect

Otay Mesa Port of Entry

Frontpage Slideshow | Copyright © 2006-2011 JoomlaWorks Ltd.
// PROJECT NOTES //

A new 40,000 sf commercial port of entry facility with offices and the capacity to handle between 100 and 115 trucks at separate docks.  The project includes incoming inspection booths with two exit booths for automobiles. Other components of the project include a separate two-bay facility for the inspection and containment of hazardous materials, a 9,000 sf drug seizure vault with rack storage (hazardous/flammable storage), an intrusion detection system, a 20,000 sf office area with security systems and controlled entry as well as remote operator camera surveillance, a 1,500 sf warehouse space, and a separate detainment lot capable of handling a minimum of 15 trucks with bulk cargo.
// PROJECT INFO //

Size: 100,000 sf
Budget: $13,200,000
Client: GSA