// PROJECT NOTES // A new 20,000 sf in-service engineering facility housing explosive bomb renovations and explosive ordinance maintenance operations. Special requirements incorporated into the design include a lightweight roof system to prevent heavy objects from falling in the event of an explosion, a high-structural framing system to accommodate Navy crane systems, and an elaborate grounding system to prevent static electricity build-up within the facility. |
// PROJECT INFO // Size: 20,000 sf Budget: $8,875,000 Client: U.S. Navy |