Due to the Command’s needs to remain fully operational during the construction of the new facilities, the development plan will require two phases for demolition and construction activities.
The first phase of construction will include the removal of the existing maintenance building and construction of the main parking lot and the new Grounds Maintenance Building. The new Grounds Maintenance building will include an exterior carport and outdoor hardscape work area.
The second phase will include the construction of a rear parking lot and the new Infantry Training Center, which houses three entities that will have separate entries. Once the building is occupied occupancy, a pedestrian walkway and small parking lot will be constructed.
The KMA project team is comprised of Don Blair, John Hilgeman, Alison Warren and Rey Zumarraga. Berg Engineering is the civil engineer, DS Engineering is the mechanical engineer, MPE Consulting is the electrical engineer, and SMR Consulting Group is the structural engineer. Additionally, K. Killman Design is the interior designer, and Crescere Design is the landscaper.
BACK TO NEWS»